Skip to content

Energy simulation

Work Done Simulation

Push a crate against friction, lift a box with a crane, pull a sledge with a rope, carry a bag and push a wall. A tape measure, an energy bar and a force–distance graph show how much work each force does and where the energy ends up.

Loading simulation…
Show symbols for

Predict first

Question 1 of 4

A worker pushes a crate 4.0 m across a warehouse floor with a steady 150 N push, and the crate slides at a constant speed the whole way. Where do the 600 J of work done end up?

Try this

  1. 1With the starting set-up (a 150 N push over 4 m), press Play. Watch the energy bar at the top of the stage fill, then compare its final reading with the Work done card.
  2. 2Choose Lift a box with a crane and set Height lifted to 3 m. Note the work done, then predict it for 6 m before you change the slider and press Play.
  3. 3Choose Pull a sledge with a rope and switch on Rope at an angle (advanced). Keep the pull at 150 N and drag the Rope angle above the ground slider from 0 to 80. How do the dashed F cos θ arrow and the work done respond?
  4. 4Choose Carry a bag across a floor and press Play. On the force–distance graph, why is there no area under the force along the motion when the upward force is so large?
  5. 5Choose Push against a wall, drag Push on the wall up to 400 N and press Play. Did the bigger push change the work done?

Five scenes, one idea

A worker shoves a crate across a warehouse floor, a crane hoists a box, someone drags a loaded sledge through snow, a student walks along with a bag, and a worker leans hard against a brick wall. A yellow tape measures how far the object moves, a bar shows how much energy reaches a store, and a force–distance graph grows as the object travels.

Force times distance

When the force points the same way as the motion,

W=FsW = Fs

where WW is the work done in joules, FF is the force in newtons and ss is how far the object moves along the line of the force, in metres. Your course may call the distance dd or SS: pick your course under the symbol switcher and the sim uses its letters. A joule is a newton multiplied by a metre, so 1 J and 1 N m are the same amount.

With the starting values, a 150 N push over 4.0 m gives 150×4.0=600150 \times 4.0 = 600 J. Double either number and the answer doubles.

Following the energy

Work done tells you how much energy has been moved somewhere, and the sim always shows where.

  • The crate slides at a constant speed, so the floor's friction matches the push exactly and the crate's kinetic energy never changes. All of the work warms the underside of the crate and the floor, and the glow at the contact grows the further it slides.
  • The crane's box rises at a steady speed, so the cable force equals the weight, mgmg, and the work comes to mghmgh. That energy is stored as gravitational potential energy. The value of gg follows your course: 9.8 N/kg for most, 10 N/kg for Punjab.
  • The sledge is like the crate: friction balances the forward pull, so the work heats the runners and the snow.

Forces that do no work

Two scenes give zero, and they trip up a lot of students. Carrying a bag at a steady speed along a level corridor needs an upward force as big as the bag's weight, yet that force does no work on the bag, because the bag moves sideways, at right angles to it, and never rises. Leaning on a wall that stays put also does no work on the wall, however hard or long you push, since the wall does not move. In both cases your arms still get tired, because your muscles use chemical energy and warm up, but that is not work done on the bag or the wall.

Reading the graph

The graph plots the force along the motion against the distance moved. A steady force gives a flat line, and the rectangle under it has an area of force × distance: the work done. Pick the area tool and drag across part of the graph to find the work over that stretch alone. For the bag the line sits on the axis, so there is no area.

A rope at an angle (advanced)

Switch on Rope at an angle in the sledge scene. Now only the horizontal part of the pull, Fcos⁡θF\cos\theta, drags the sledge forwards, so

W=Fscos⁡θW = Fs\cos\theta

A 10 N pull at 60° over 5.0 m does 10×5.0×0.5=2510 \times 5.0 \times 0.5 = 25 J. The vertical part, Fsin⁡θF\sin\theta, does no work, since the sledge never leaves the snow. The AQA GCSE and Cambridge IGCSE equations use a force along the motion, so treat this as extension work there. The Punjab Class 9 course includes it.

The model

Starting and stopping are left out: each object moves at one steady speed for the whole distance, and air resistance is ignored. If the crate or the box starts and finishes at rest, the push or the cable still does the same total work, because there is no overall change in kinetic energy.

Equations

  • Work done

    W=Fs

    work done = force × distance (along the line of action of the force)

    Open calculator →

Check your understanding

8 questions

  1. 1.A shopper pushes a trolley 12 m along a level aisle with a steady 40 N force in the direction it moves. How much work does the push do?
  2. 2.Which of these is the same amount as one joule?
  3. 3.A crane lifts a 50 kg load 8.0 m at a steady speed. Take g = 10 N/kg. How much work does the cable do on the load?
  4. 4.A heavy box is dragged across a rough floor at a constant speed. Where does the energy transferred by the pull end up?
  5. 5.A waiter carries a tray across a room at a steady speed, holding it level. How much work does the upward force from the hand do on the tray?
  6. 6.On a graph of force against distance moved, what does the area under the line represent?
  7. 7.A student pushes on a solid wall with a 250 N force for 30 s. The wall does not move. How much work is done on the wall?
  8. 8.(Force at an angle, advanced) A rope at 60° above the ground pulls a box 4.0 m along level ground with a force of 20 N. How much work does the rope do?

For teachers

Embed it in your site or open it full-screen for the projector.

Read more